top of page
Final Report with Appendices
Executive Summary

These reports contains the findings obtained during the spring semester. The first analysis investiagtes and alternative HVAC system for the White Space. Analysis 2 focuses on prefabricating and altertnative facade. Analysis 3 reseaches the benefits of an alternative contract structure for the project. Lastly Analysis 4 researches the ebenfits oif knowledge management IT systems.

 

 

User Note:

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Donald Rossi. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.
bottom of page